Dana Probert

February 2012

Sun Mon Tue Wed Thu Fri Sat
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29      

Twitter Updates

    follow me on Twitter

    My Recent Bookmarks

    « Volumes Dashboard Extension for AutoCAD Civil 3D 2012 | Main | Solving Problems with a BIM for Infrastructure Process »

    January 15, 2012

    TrackBack

    TrackBack URL for this entry:
    http://www.typepad.com/services/trackback/6a0111684f7606970c0168e59abb16970c

    Listed below are links to weblogs that reference Help Dana Design a Road from Point A to Point B:

    Comments

    Through the hill! (You know you want to...)

    Sure I will bite. Load the project constraints into Trimble Quantm

    http://www.trimble.com/alignment/road-alignment.aspx?dtID=overview

    Since my boss likes to see options, do both. :)

    But in all seriousness, we'd have to document the reasons why one route was selected over another, and cost is only one issue. Realistically you should run both conceptual designs and keep a record of the design issues with each option.

    Verify your Comment

    Previewing your Comment

    This is only a preview. Your comment has not yet been posted.

    Working...
    Your comment could not be posted. Error type:
    Your comment has been saved. Comments are moderated and will not appear until approved by the author. Post another comment

    The letters and numbers you entered did not match the image. Please try again.

    As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

    Having trouble reading this image? View an alternate.

    Working...

    Post a comment

    Comments are moderated, and will not appear until the author has approved them.

    RSS Feed

    • Subscribe